Last night we met with Tom Benson, one of Jon's former shipmates. We screened the film for him and he enjoyed it. Made him a copy, and I'm happy to get his approval.
As much as I'd like to reflect on the evening, I have a ton of work to do.
It's time to meet deadlines. I dealt with it before during Epidemic, but now this is a self-imposed. If I work extremely hard this week, I know I can do it.
My task list for this week:
Prepare Intro to be mixed by Dean. Make some slight changes to his sinking sequence mix too.
Clean up pre-existing B-Roll photos in Photoshop. Possibly re-animate if time allows.
Add new Before/After B-Roll of Jon's boat blueprints, transitioning to the final finished boat. For Act 1.
Modify credit sequence to reflect updated changes.
Get the remaining music from Chris Waltz, mix it, drop it in.
Finalize all music decisions. Transition from FCP to Soundtrack Pro.
Complete a final mix of the entire film. Who knows how much time I'll have, but I'll try my best. Obviously, mixing dialog is first priority.
Export to FCP - Convert Project to 480i, remove matte bars, re-render highest quality. Prep everything for DVD exporting.
Hopefully, we'll have time to play a final cut of the film for Brad Hughes. My guess is probably not.
Either way, I'll export to DVD, test and re-test it, and then send it off to festivals.
My goal is to do all of this by Saturday, Oct. 10th.
----
I predict some all nighters. I predict lots of stress too, but I will definitely get this finished!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment